3rd Dimension Design Logo

UC Davis CUP

UTILITY

UC Davis CUP (In Progress)

General Contractor: Rudolph & Sletten

Sub Contractor: REG

Building Type: Utility

BIM and VDC Service provided: Electrical (Power, Low voltage, Lighting, Fire alarm)

LOD: 400

Sqft: 40,000

Date: 2024-2025

Services Provided

  • BIM Modeling and Coordination
  • Shop Drawings
  • As built documentation
  • Trimble Field layout

Project Summary

The UC Davis Sacramento Health Central Utility Plant (CUP) Expansion Project constructs an approximately 40,000-gross-square-foot expansion to the CUP, providing necessary space for equipment and operations enhancement to improve utility capacity, reliability, and performance. The project also upgrades the existing building and operations to meet seismic code compliance. The project is designed to position UC Davis Health to move towards sustainability requirements with electrified CUP operations over the long-term through a new dedicated connection to the local electricity provider. The components of the CUP Expansion Project include both make-ready projects and CUP expansion construction and operation.

Contact Us

Ready to take your projects to new heights?  Use the contact form below to connect directly with our team, who are ready to address your inquiries, share insights, and craft tailored solutions to meet your unique needs.

Contact 3DD

Do you have a question, feedback, or want to discuss a current or future project? Feel free to get in touch with us using the form below. Our team will get back to you as soon as possible.