Lygos Inc.

INDUSTRIAL

Lygos Inc. Phase 1 (In Progress)

General Contractor: MAI

Sub Contractor: IME

Building Type: Industrial

BIM and VDC Service provided: Electrical (Power, Low voltage, Lighting)

LOD: 350

Sqft: 90,10

Date: 2023 to 2024

Services Provided

  • Detailing and design
  • BIM Modeling and Coordination
  • Shop Drawings
  • As built documentation
  • Trimble Field layout

Project Summary

Phase 1 of this project consists of a new interior buildout of an existing 1-story building. This includes a new floor plan layout to accommodate the technical systems, testing centers, and required laboratories.

Contact Us

Ready to take your projects to new heights?  Use the contact form below to connect directly with our team, who are ready to address your inquiries, share insights, and craft tailored solutions to meet your unique needs.

Contact 3DD

Do you have a question, feedback, or want to discuss a current or future project? Feel free to get in touch with us using the form below. Our team will get back to you as soon as possible.