UC Davis CUP
UTILITY
UC Davis CUP (In Progress)
General Contractor: Rudolph & Sletten
Sub Contractor: REG
Building Type: Utility
BIM and VDC Service provided: Electrical (Power, Low voltage, Lighting, Fire alarm)
LOD: 400
Sqft: 40,000
Date: 2024-2025
Services Provided
- BIM Modeling and Coordination
- Shop Drawings
- As built documentation
- Trimble Field layout
Project Summary
The UC Davis Sacramento Health Central Utility Plant (CUP) Expansion Project constructs an approximately 40,000-gross-square-foot expansion to the CUP, providing necessary space for equipment and operations enhancement to improve utility capacity, reliability, and performance. The project also upgrades the existing building and operations to meet seismic code compliance. The project is designed to position UC Davis Health to move towards sustainability requirements with electrified CUP operations over the long-term through a new dedicated connection to the local electricity provider. The components of the CUP Expansion Project include both make-ready projects and CUP expansion construction and operation.
Contact Us
Ready to take your projects to new heights? Use the contact form below to connect directly with our team, who are ready to address your inquiries, share insights, and craft tailored solutions to meet your unique needs.